Six Sigma Lean Six Sigma Green Belt practice questions

10 free questions with answers and explanations. Try each one, then tap “Show answer”.

  1. Measure

    1. A process has three steps with first-pass yields of 95%, 95% and 98%. What is the rolled throughput yield?

    • A. 95%
    • B. 88.4%
    • C. 83.4%
    • D. 96%
    Show answer

    Answer: B. 88.4%

    RTY = 0.95 × 0.95 × 0.98 = 0.884 → 88.4%.

  2. DMAIC

    2. What are the five phases of DMAIC?

    • A. Define, Map, Act, Inspect, Correct
    • B. Define, Measure, Analyse, Improve, Control
    • C. Discover, Measure, Adjust, Improve, Communicate
    • D. Design, Make, Assess, Implement, Close
    Show answer

    Answer: B. Define, Measure, Analyse, Improve, Control

    The core Six Sigma improvement method.

  3. Measure

    3. 200 units are inspected, each with 8 opportunities for a defect. 34 defects are found. What is the DPMO?

    • A. 21,250
    • B. 42,500
    • C. 10,625
    • D. 170,000
    Show answer

    Answer: A. 21,250

    DPMO = defects ÷ (units × opportunities) × 1,000,000 = 34 ÷ 1,600 × 1,000,000 = 21,250.

  4. Measure

    4. A process has three steps with first-pass yields of 98%, 95% and 92%. What is the rolled throughput yield?

    • A. 92%
    • B. 80.7%
    • C. 95%
    • D. 85.7%
    Show answer

    Answer: D. 85.7%

    RTY = 0.98 × 0.95 × 0.92 = 0.857 → 85.7%.

  5. Measure

    5. 2,500 units are inspected, each with 8 opportunities for a defect. 23 defects are found. What is the DPMO?

    • A. 2,300
    • B. 1,150
    • C. 9,200
    • D. 575
    Show answer

    Answer: B. 1,150

    DPMO = defects ÷ (units × opportunities) × 1,000,000 = 23 ÷ 20,000 × 1,000,000 = 1,150.

  6. Lean

    6. In Lean, which of these is one of the 8 wastes (DOWNTIME)?

    • A. Standard work
    • B. Over-processing
    • C. Value-added time
    • D. Customer feedback
    Show answer

    Answer: B. Over-processing

    Defects, overproduction, waiting, non-utilised talent, transportation, inventory, motion, extra-processing.

  7. Tools

    7. Which tool distinguishes common-cause from special-cause variation over time?

    • A. Pie chart
    • B. Pareto chart
    • C. Affinity diagram
    • D. Control chart
    Show answer

    Answer: D. Control chart

    Points outside the control limits suggest special causes.

  8. Measure

    8. 2,500 units are inspected, each with 4 opportunities for a defect. 40 defects are found. What is the DPMO?

    • A. 2,000
    • B. 16,000
    • C. 4,000
    • D. 8,000
    Show answer

    Answer: C. 4,000

    DPMO = defects ÷ (units × opportunities) × 1,000,000 = 40 ÷ 10,000 × 1,000,000 = 4,000.

  9. Measure

    9. 500 units are inspected, each with 10 opportunities for a defect. 35 defects are found. What is the DPMO?

    • A. 7,000
    • B. 3,500
    • C. 70,000
    • D. 14,000
    Show answer

    Answer: A. 7,000

    DPMO = defects ÷ (units × opportunities) × 1,000,000 = 35 ÷ 5,000 × 1,000,000 = 7,000.

  10. Measure

    10. A process has three steps with first-pass yields of 98%, 95% and 96%. What is the rolled throughput yield?

    • A. 89.4%
    • B. 95%
    • C. 84.4%
    • D. 96.3%
    Show answer

    Answer: A. 89.4%

    RTY = 0.98 × 0.95 × 0.96 = 0.894 → 89.4%.

Want more Six Sigma Lean Six Sigma Green Belt questions?

Get fresh questions every day, focused on your weak topics, plus timed mock tests. Free to start.

Practise free in the web app Practise on Telegram

About the Six Sigma on Mock Night · Original practice questions; not affiliated with the exam board.